Geological engineers, geologists, environmental geologists, civil engineers, and construction staff examining an earth fissure exposed during construction of the Loop 202 east of Phoenix. The fissure was mitigated by deploying a geosynthetic liner.
Photographer: Joseph Cook
Photo Date: June 2006
Photo Location Accuracy: Approximately Located
Photo Tags: earth fissure, Loop 202, geologic hazard